The project's earthing design on the IEC calculation: earth pits, GI strip and Cu cable sizes, the plan, a report and a BoQ, and where the design goes.
Earthing Design is the project's earthing design. It works out how many earth pits the plant needs and where they go, which GI strip or Cu cable size each earthing connection needs, whether the plant grid meets its resistance target and the touch-voltage limit, and what all of it adds up to as a bill of quantities. It draws the earthing plan over the plant and exports the plan, the calculation and the quantities.
The design basis is IEC. IS 3043 and IEEE 80 figures are worked out alongside as cross-checks and printed next to the IEC ones, so a reviewer working to either can see both. The one place a cross-check enters the result is the plant grid resistance, carried forward as the larger of the IEC and IEEE 80 values.
The design belongs to the project. Its inputs are saved with the project, and the bill of materials, the plan, the deliverables package and the Layers popover all read the design without the window being open.
Opening it
Two routes open the same window, and both are greyed out until a layout exists:
- Tools ▸ Earthing Design… on the menu bar.
- ⚡ Earthing Design, the last of the five buttons in the Studies card on the Tools tab.

There is one window: opening it again brings the open one forward. It works on every plot of the layout that holds tables; water plots and plots with no tables are left out.
The window
Earthing Design opens beside the main window rather than in front of it, so you can keep it open while you work; it can be minimised and maximised. A verdict banner runs across the top. The inputs sit on the left in a scrolling column; the results sit on the right in three tabs, Layout, Calculation and BoQ; the exports are in the footer.

There is no Run button. The window calculates as it opens, and again about a third of a second after you change an input. The system frequency is taken as 50 Hz.
The window follows the layout. When the layout is replaced, by a Generate, opening a project, a cable refresh or a regroup, the window closes; open it again for the new layout. Your inputs are kept. While the inputs of the run are out of date the banner reads Out of date. These figures are from the last run, and n inputs have changed since. Regenerate the layout to update them., and the exports are off with "Inputs changed since the last run. Regenerate first."
Editing an earthing input re-feeds the bill of materials and marks the project changed. It does not make the layout out of date.
Inputs
Eight groups, in the order they appear.
Array earthing
| Field | Default | Options | What it does |
|---|---|---|---|
| Rule | Jumpers and a ring | Jumpers and a ring / A strip along each row | How the tables are bonded. See What gets earthed |
Soil & site
| Field | Default | Range | What it does |
|---|---|---|---|
| Soil resistivity (Ω·m) | 50.0 | 0–100,000; 0 shows Unknown | The measured soil resistivity, from a Wenner four-pin test; 50 Ω·m is assumed until it is measured. Multiplied by the season factor, it gives the design resistivity |
| Season factor | 1.50 | 1–5 | The dry-season multiplier, for a test done in the wet season |
| Gravel resistivity (Ω·m) | 3000 | 0–100,000 | The gravel or crushed-rock layer at the ICR and MCR yards: the surface layer in the touch and step limits |
| Gravel thickness (m) | 0.10 | 0–1 | Used in the IEEE 80 surface-layer factor |
| Soil corrosion | Medium | Low / Medium / High | Sets Corrosion allowance to 15, 25 or 40 % |
| Corrosion allowance (%) | 25 | 0–200 | Extra cross-section added to every GI strip for corrosion over the design life |
| Design life (years) | 25 | 1–60 | Printed in the report |
With the defaults the design resistivity is 75 Ω·m.
Unknown soil. Set Soil resistivity to 0 and it reads Unknown: one pit at each earthing point, nothing sized from the soil, and the grid not checked. The banner reads "n earth pits · soil resistivity unknown" and asks for a measured value.

Fault data
| Field | Default | Range | What it does |
|---|---|---|---|
| LV fault current (kA) | 5.0 | 0.1–200 | The inverter AC-side earth fault. Sizes the array strip and the Cu cable |
| LV fault time (s) | 1.00 | 0.05–5 | Its duration, for the same sizing |
| MV voltage (kV) | 33.0 | 1–66 | Names the main-grid duty and appears in the report |
| MV fault current (kA) | 25.0 | 0.1–200 | Sizes the main-grid strip, and is the fault current for touch and step |
| MV fault time (s) | 1.00 | 0.05–5 | Its duration, for the main-grid strip sizing |
| MV neutral | Solidly earthed | Solidly earthed / Resistance earthed (NGR) | A report label. With an NGR, enter the NGR-limited current as MV fault current |
| HV voltage (kV) | 132 | 66 / 132 / 220 | Sets HV fault current to 31.5, 40 or 50 kA |
| HV fault current (kA) | 40.0 | 0.1–200 | The HV duty, for the report only |
| HV fault time (s) | 1.00 | 0.05–5 | The same |
| Show HV in report | off | — | The design stops at the MCR; when ticked, the HV switchyard strip size is shown in the report only |
| Touch / step duration (s) | 1.00 | 0.05–5 | The fault duration used for the touch and step voltages |
| Split factor | 1.00 | 0.05–1 | The share of the MV earth-fault current that flows into the grid |
| X/R | 10.0 | 0.1–60 | The system X/R ratio, for the decrement factor |
Targets
| Field | Default | Range | What it does |
|---|---|---|---|
| Whole plant (Ω) | 1.00 | 0.05–50 | The plant grid target. Drives the verdict and the supplementary pits |
| Each earth pit (Ω) | 5.0 | 0.1–100 | The target for each equipment earthing point |
| LA earth pit (Ω) | 10.0 | 0.1–100 | The target for each lightning arrester's ring of pits |
| Pit rule | One pit per point, bonded to grid | or Add pits until each point meets target | How many pits each equipment point gets. See Earth pits |
Earth pit (maintenance-free)
| Field | Default | Range | What it does |
|---|---|---|---|
| Electrode length (m) | 3.0 | 1–60 | The length of each pit's electrode |
| Rod diameter (mm) | 17.2 | 5–100 | The Cu-bonded rod diameter |
| Bore diameter (mm) | 150 | 20–500 | The bore, filled with backfill compound |
| Backfill resistivity (Ω·m) | 0.20 | 0.01–50 | The backfill compound's resistivity |
| Pit spacing (m) | 6.0 | 1–50 | The spacing between pits; keep it at least twice the electrode length |
| Strip depth (m) | 0.60 | 0.3–3 | The GI strip burial depth |
Conductors
| Field | Default | Range | What it does |
|---|---|---|---|
| Initial temperature (°C) | 30 | 0–60 | The conductor temperature before a fault |
| Final temperature (°C) | 300 | 150–500 | The highest temperature of buried galvanised steel during a fault |
| GI strip sizes (mm) | 25x3, 25x6, 32x6, 40x6, 50x6, 50x10, 50x12, 65x10, 75x12 | text | The strip sizes you can buy, as width x thickness |
| Cu cable sizes (mm²) | 4, 6, 10, 16, 25, 35, 50, 70, 95, 120 | text | The Cu earthing cable sizes you can buy |
| Wastage (%) | 5 | 0–50 | Added to every strip and cable total |
The size lists are read when you press Enter or leave the field. A list that cannot be read is put back to the last good one, with a hint under the field saying why, such as "“abc” is not width x thickness (e.g. 50x6). The last list is kept."
Equipment rules
| Field | Default | Range | What it does |
|---|---|---|---|
| IDT per ICR (fallback) | 2 | 0–10 | Used only when the layout has no transformer grouping |
| Pits per ICR / USS | 10 | 0–30 | Pits spread on the ring of each ICR and USS |
| Body pits per IDT | 2 | 0–8 | Body pits beside each IDT (inverter duty transformer) |
| Neutral pits per IDT | 0 | 0–8 | Neutral pits per transformer |
| Pits for MCR | 10 | 0–30 | Pits spread on the MCR ring |
| Pits per power transformer | 2 | 0–8 | Body pits for each power transformer, at the MCR |
| Pits per string inverter | 1 | 0–4 | Pits at each string inverter. A central plant's SMBs bond to the table structure |
| Aux transformer at MCR | on | — | Adds auxiliary-transformer neutral pits and a body link |
| Aux TX neutral pits | 2 | 0–8 | Their number |
| Pits per LA | 2 | 1–12 | At least this many in the ring round an arrester, more when LA earth pit needs them |
| Fence pit every (m) | 50 | 0–1000 | Fence pit spacing; 0 means no fence pits |
| Gates per plot | 1 | 0–20 | Each plot has its own fence and gates |
| CCTV pole every (m) | 0 | 0–2000 | CCTV pole spacing; 0 means no CCTV poles |
| Weather stations | 0 | 0–10 | For the whole site, next to the MCR |
| Serrated washers / module | 4 | 0–12 | Serrated washers per module, for frame bonding |
| Tracker bonding jumper (mm²) | 16 | 6–120 | Trackers: the flexible tinned Cu braid across each bearing and the slew drive |
| Jumper length (m) | 0.50 | 0.1–5 | The length of each jumper |
| Bearing spacing (no piles) (m) | 7.5 | 1–30 | Trackers without a pile pattern: jumpers are estimated from the tracker length at this spacing |
Layout rules
| Field | Default | Range | What it does |
|---|---|---|---|
| Jumper: the gap + (m) | 0.30 | 0–2 | Jumpers and a ring: a jumper is the gap plus this |
| A break: a gap over (m) | 2.0 | 0.1–50 | A gap wider than this is a break, not a jumper |
| Longest break bridged (m) | 50 | 2–1000 | A longer break splits its row in two, each part joined at its ends |
| Ring inside the fence (m) | 1.0 | 0–20 | Where the main ring runs |
| Ring pit every (m) | 100 | 0–1000 | Pit spacing on the main ring; 0 means no ring pits |
| Strip in AC / MV trenches | on | — | Lays strip along the MV and AC cable routes and any trenches you drew. When off, or with no MV route, an L-shaped MV backbone joins each ICR ring to the USS or MCR ring |
| MMS link length (m) | 2.0 | 0–20 | A strip along each row only: strip per MMS table, for the riser and clamp. Counted, not drawn |
| Equipment link length (m) | 5.0 | 0–50 | Strip per equipment body link |
| Fence / pole link length (m) | 3.0 | 0–50 | Strip per fence, CCTV and street-light pit |
| Row runner gap split (m) | 15 | 1–200 | A strip along each row only: a row runner is broken at any gap bigger than this |
| Max cross-link length (m) | 30 | 1–200 | A strip along each row only: the longest row-to-row cross link |
What gets earthed
The network is built plot by plot. Rule decides how the tables are bonded:
The default.
- a GI jumper across each gap between neighbouring tables of a row, as long as the gap plus Jumper: the gap +. The tables' structure carries the bond between jumpers, and is not counted;
- a break bridge across a gap wider than A break: a gap over, if it stays inside the fence and is no longer than Longest break bridged. A longer one, or one that would leave the plot, splits the row;
- straight strips joining row ends row to row, at both ends;
- a main ring on the MV duty, Ring inside the fence inside each fence, with a pit every Ring pit every.
Under either rule:
- a Cu cable from each inverter or SMB to the nearest array conductor;
- strip along the MV, AC and hand-drawn trench routes, when that option is on;
- a ring 1.5 m round each ICR, USS and MCR, with its pits spread on the ring;
- IDT body and neutral pits south of each ICR. The transformer count comes from the electrical grouping, or the fallback;
- power transformer body pits north of the MCR and auxiliary neutral pits south of it; weather-station pits on one plot;
- a ring of pits round each lightning arrester;
- a fence strip along the whole fence, joining its pits; gate pits on the first fence; CCTV and street-light pits;
- a string inverter's own pits, on string plants only;
- on trackers, a bonding jumper at each pile of the pile pattern, or estimated from the bearing spacing when there is none.
Each strip and cable total is the drawn length plus the allowances, plus Wastage. A site with several plots gets one network and one grid check per plot; the banner reports the worst.
Pits are counted by category: ICR body, USS body, IDT body, IDT neutral, MCR body, power transformer body, string inverter, main ring, aux transformer neutral, lightning arrester, fence and gate, CCTV pole, street light pole, weather station and supplementary (grid).
Method and standards
| Step | Governing method | Cross-checks shown alongside |
|---|---|---|
| Conductor sizing | IEC 60364-5-54 Annex A, S = I·√t / k; minimum sizes from IEC 62561-2 / IEC 60364-5-54 Table 54.1 | IS 3043, IEEE 80 |
| One earth pit | Dwight formula with the backfill column (BS 7430 / EN 50522 practice) | IS 3043 |
| Plant grid resistance | EN 50522 meshed electrode, R = ρ / (2D) (IEC 61936-1) | IS 3043, IEEE 80 |
| Touch voltage | IEC 61936-1 / EN 50522, with IEC 60479-1 body data | IEEE 80 mesh and step voltages |
| Lightning arrester earthing | IEC 62305-3, type A arrangement | — |
| Module and MMS bonding | IEC 62548, IEC 60364-7-712 | — |
Conductor sizes
Each connection is sized for its fault duty from S = I·√t / k, with k for
galvanised steel taken from the initial and final temperatures: 68.7 on the
defaults. The required area is the larger of that and 90 mm², plus the
corrosion allowance, and the strip chosen is the smallest in your list that
meets it and is at least 3 mm thick. There are four duties: Main grid
(the ICR and MCR rings, transformer bodies and neutrals, the HT panel, the MV
backbone), Array field — LV (row runners, cross links, MMS links, AC-trench
strip, central inverters), Lightning arrester, and Fence, gates &
poles, the last two at the minimum size. Show HV in report adds an HV
switchyard duty to the report only. On the defaults that gives 50x10 for the
main grid and 25x6 for the rest.
The Cu cable is sized from the LV fault with k = 143 and a 6 mm² minimum, and carries no corrosion allowance: 35 mm² on the defaults. If no listed size is big enough for a duty, the report says so and asks for a larger size.
Earth pits
One pit on the defaults comes to 16.24 Ω by the IEC method (17.44 Ω by IS 3043). The Pit rule decides what happens next:
- One pit per point, bonded to grid (the default): each equipment point gets one pit, bonded to the main grid, so the whole-plant value applies at every point. When one pit alone misses Each earth pit, the report notes it and the banner adds "One pit alone is R Ω; bonded to the grid it takes the plant value."
- Add pits until each point meets target: pits are added in a line at each point until it meets Each earth pit on its own, up to 50 pits. Section 4 of the report states the count, as in "1 → 16.24 Ω (! Not met vs 5 Ω); IS 3043 needs 5" on the default rule.
Each arrester gets a ring of at least Pits per LA, grown until it meets LA earth pit: two pits on a ring come to 9.11 Ω on the defaults, within the 10 Ω target. The report also gives the electrode length one pit would need to meet its target alone, 13.3 m on the defaults, and warns when the electrode is shorter than 2.5 m, the rod thinner than 15 mm, or the pit spacing less than twice the electrode length.
Plant grid and touch voltage
The IEC grid resistance depends only on the plot's area and the design resistivity: adding strip or pits does not lower it. The IEEE 80 figure does respond to the network, and the resistance carried forward is the larger of the two. When the IS 3043 or IEEE 80 figure misses Whole plant, supplementary pits are added along the array until both meet it. When the plot's area alone puts the target out of reach, the report says so, suggesting a grid extended outside the array (counterpoise) or soil treatment.
For touch and step, the grid current is the MV fault current × Split factor × a decrement factor from X/R and the duration; the earth potential rise is that current × the grid resistance. The IEC check passes when the earth potential rise, or failing that the mesh touch voltage, is within the permissible touch voltage, allowing for footwear and the gravel layer.
Results
The verdict banner
With a soil resistivity set, the banner reads "n earth pits · plant grid R Ω (target ≤ T Ω)", with the strip lengths by size and the Cu cable length under it. At the assumed value it adds "Soil resistivity assumed at 50 Ω·m, not measured: enter the measured value to confirm the grid."
It turns amber, with an exclamation mark, when something needs your attention:
| Detail line | What to do |
|---|---|
| "No listed size fits the <duty> — extend the size list." | Add a larger size to GI strip sizes or Cu cable sizes |
| "Each equipment point needs more than 50 pits to reach T Ω — treat the soil or lower the target." | Treat the soil, or lower Each earth pit |
| "The grid misses its IEC target or touch limit — see Calculation." | Open Calculation. The touch limit can fail while the resistance target is met |
If a calculation fails on the inputs, the banner reads Could not calculate with these inputs and names the fields to check. The plan and tables show the last good result and the exports are off, with the reason "Fix the inputs to export".
Layout
The earthing plan over the plant, with the boundary, tables, ICRs, the MCR and the inverters in the background. The strips are coloured by duty (main grid red, array and AC trench blue, arresters purple, fence and poles grey, Cu cable green dashed), with a marker for each kind of pit and a legend with the count of each. The plot toolbar zooms and pans it.
Calculation
The calculation as a report, each check marked ✓ OK or ! Not met, in numbered sections: 1. Design basis, 2. Key inputs, 3. Conductor sizing (GI strip / Cu cable), 4. Earth pit design, 5. Plant earth grid resistance (Ω) (one row per plot), 6. Touch & step voltage (MV earth fault), 7. Where each earthing connection goes, 8. Earth pit count, 9. Bill of quantities, and 10. Notes when there are any.

BoQ
S.No · Description · Qty · Unit · Remark: the maintenance-free earth pit, with the pit count by category in the remark; one row per GI strip size, including wastage; the Cu earthing cable; the jumpers and break bridges, or the MMS earthing connections under A strip along each row; the serrated washers; the tracker bonding jumpers, on a tracker plant; and the arrester test joints.

Exports
| Button | Default file | What it holds |
|---|---|---|
| Export PDF report… | Earthing_Design.pdf | "Earthing Design Report — <project>": sections 1–10 on A4 portrait pages, then the Earthing Layout on an A3 landscape page |
| Export DXF… | Earthing_Layout.dxf | The plan in the layout's own coordinates: the layout on REF_LAYOUT, one layer per strip size and duty (such as EARTH_GI_50X10_MV, EARTH_GI_25X6_LV), one for the Cu cable, and one per kind of pit |
| Export BoQ… | Earthing_BoQ.csv | The BoQ as CSV, with the columns S.No,Description,Qty,Unit,Remark |
After a save the footer reads "Saved <path>". Each export needs active access, and each waits for a layout or cable run to finish and for an out-of-date layout to be generated again.

Where the design goes
The design needs no opening of this window to reach the rest of the application.
| Place | What it carries |
|---|---|
| The project file | The inputs that differ from the defaults. File ▸ New Project starts them again at the defaults |
| Layers ▾ ▸ Earthing | The strips, jumpers and pits on the plan, off by default and in the Cables group. It follows your edits and hides with Plant layout |
| Bill of materials | Strip by class, jumpers, pits by kind and bolt sets, as measured lines. The trench strip drops out with Calculate cables off |
| Export ▾ Earthing layout (DXF)… | The earthing layout on its own, as Earthing_Layout.dxf. See Exports |
| Drawing set | The D6 earthing sheets, and their layers in the DXF twin |
| Design report | Section 8, Earthing: inputs, conductor sizing, the earth grid check and quantities |

The Summary has no earthing row.
The BOM and this window's BoQ can differ. The BOM takes the inverters' Cu earthing cable by its own rule, 15 m for each, and adds its own rule lines, while the BoQ measures the design.
The design is worked from the soil resistivity and fault levels you enter. Until a soil test confirms it, the grid check rests on an assumed 50 Ω·m. Confirm it against a measured soil model and the actual fault study before it is issued for construction.
Where to go next
Robot count from DXF
Size a cleaning-robot fleet from any plant layout drawing, without generating a layout and without changing the open project.
Building the single-line diagram
The SLD view — the diagram built from your layout, how it follows the layout, the printed sheet, and the editing tools for changing it or drawing your own.