Beside the drawings and the report, the package writes the design as rows and as a map: S1, the schedules workbook; S2, the bill of materials; K1, the KMZ for Google Earth; and two small files, piles.csv and manifest.json. Each is a row in Export deliverables, written from the same snapshot as the drawings.

S1, the schedules workbook

One workbook for the plant, with eight sheets, always all present. Each has a frozen header and an autofilter, with numbers as numbers and no merged cells, so it sorts and filters as it opens.

SheetColumns
READMEThe project, code, client, company, boundary file and coordinates; then a description of each sheet and column, and an empty sheet's reason
BlocksBlock, Plot, ICR, Tables, Strings, Modules, DC (kWp), Devices, ACCBs, IDTs, IDT rating (kVA), Feeds, Feeder runs, Feeder length (m)
TablesTable, Plot, Block, Device, Unit, Strings, Modules, Easting (m), Northing (m), Latitude, Longitude, Piles
InvertersDevice, Kind, Plot, Block, ICR, ACCB, Tables, Strings, DC (kWp), AC (kVA), DC:AC, Feeder circuit, Feeder length (m), Feeder size (mm²), Feeder drop (%), Flag
CablesCircuit, Class, Plot, Block, From, To, Strings, Cores, Runs, Size (mm²), Length (m), Cable (m), Before Y (m), Before Y size (mm²), Current (A), Drop (%), Flag
TrenchesPlot, Class, Laying, Routes, Drawn by hand, Route length (m), Trench length (m), DC drawn sample
PilesPlot, Block, Unit, Tables, Piles per unit, Piles
Area accountPlot, Item, Area (m²), Area (ha), Net (m²), Length (m), Count, Note

The Cables sheet's classes are DC string, AC feeder, DC trunk, LV to IDT and MV. How the routes and sizes are worked out is on Cable routing.

The Area account has rows per plot and then for the plant: gross site, each exclusion, layout area, usable for tables, under tables, coverage, fence and closure.

An empty sheet

A sheet with nothing to list keeps its header, and the README gives its reason.

ReasonWhat to do
"No cable routes were drawn: tick Calculate cables and Generate"Turn on Calculate cables on the Electrical tab and generate again
"No table carries a pile pattern."Define a pattern. See Piles
"The plant has no ICR blocks."
"The plant has no cable circuits."
"The plant has no inverters or SMBs."
"The plant has no tables."

S2, the bill of materials

S2 is the BOM's own workbook under its package name, written from the BOM as it stands at that moment. Its lines, its Block-wise sheet and its Open items sheet are described on Bill of materials. An issued package adds Revision and Issued rows to its header.

The Check column on the Block-wise sheet is a sum check, "✓ adds up", and not a design check. No design check reaches this file.

K1, the KMZ

K1 writes the plant at its real location for Google Earth, organised into folders you can switch on and off. It has two jobs: handing the design to somebody without CAD, such as a landowner, a client's commercial team or a contractor walking the site; and your own check of the plant against real ground.

FolderContents
SiteA polygon per plot
Perimeter roadThe road band
ExclusionsWater, Obstacle, Transmission-line corridor, Road, Steep ground and Drawn obstruction, as far as they are present
BlocksEach block's outline, its ICR, its tables and its devices
The MCR, USSs and handover pointEach where the design has one
ArrestersLabelled points, with their protection radii hidden
MV routesMV route n

The file's name in Google Earth reads like "AUD · K1 · 2026-11-05", and its pop-up gives the plant's DC MWp, AC MW, Tables (full + half), Modules, Strings, Inverters, ICRs, Arresters and Area ha.

Inside Blocks, the placemark B01 opens a pop-up with the block's Tables (full + half), Modules, Strings, DC MWp, Inverters, ACCBs, AC MVA, DC:AC, IDT kVA and Area ha. B01-ICR marks its control room. A folder B01 holds Tables and each device as a labelled point such as B01-INV-01. Tables is one geometry with no per-table pop-up, and it draws once you are close enough to the block.

What the KMZ leaves out

DC and AC routes, piles, street lights and terrain contours are not in the file. Take the routes and the piles from the drawing set and the schedules. Ground excluded for slope does appear, as Steep ground.

When it can't go

A site continued as Layout only has no location, so the KMZ row is unticked and disabled: "The site's location is unknown (layout only), so a KMZ would put the plant in the wrong place." To write one, pick the boundary file again, say where the drawing sits in the Site reference window, and generate again. See CAD boundaries. A plant with no block grouping has no KMZ either.

Checking the design against real ground

Your boundary file is a claim about the site, and the imagery is a record of it. Compare them on every project, because it catches errors nothing else catches.

  1. Is the plant where you expect it? A boundary file with a coordinate problem produces a correct layout in the wrong place. Over imagery this is obvious at once.
  2. Do the exclusions match the ground? A pond that has moved, a canal that was never drawn or a track worn across the site shows on the imagery and may not be in your file. Each difference is a table that should not have been placed, or ground given away for nothing.
  3. Is the boundary the parcel you control? Field boundaries and access tracks are usually visible. Resolve a plant boundary that crosses one before you issue.
  4. Is access plausible? Roads, gates and the route heavy equipment must take are on the imagery and not in the layout.

Anything that fails these checks is a problem in the input. Fix the boundary file and generate again. See Boundary file requirements.

The tick boxes in Google Earth's places panel make this easier: switch the tables off and the exclusions stay, so you see the ground the layout kept clear.

Satellite, among the Layout view's tools, makes the same comparison inside the application. It needs a site whose location is known, and an internet connection.

Imagery has a date and a position error. Treat a small offset between your boundary and a feature on the imagery as a question to investigate, not as proof that either is wrong. A CAD or image boundary placed by latitude and longitude lands where you typed, so check that point first. The file is a map and not a drawing: take dimensions from the drawing set.

The small files

piles.csv

Written beside the drawing set when the D4 pile layout sheets exist. It has one row per pile, in UTF-8.

ColumnHolds
pile_idThe pile's ID, such as P1-B01-T0001-P01
table, block, plotWhere it belongs
easting_m, northing_mIts position in the drawing's coordinates, to the millimetre
latitude, longitudeTo 7 decimal places; blank when the site's location is unknown

manifest.json

Always written. It records the snapshot's ID, the application version, when the package was created, the revision, the purpose, the issue's details, and a SHA-256 hash of every other file in the folder, piles.csv included. Use it to confirm that a file a recipient holds is the file you sent. It carries no check results.