Inputs

OPEX, revenue and penalties

Annual O&M and its escalation, the PPA tariff and shortfall penalty, the CUF cap, 3rd-party export pricing, grid charging, and the Optimise target IRR.

The ๐Ÿ“Š OPEX tab sets the plant's operating cost, the tariff and penalty that drive its revenue, the price paid for any 3rd-party export, the terms under which the battery may charge from the grid, and the target โš™ Optimise searches for.

The OPEX tab's O&M, Revenue & Penalty, Export Price and Grid Charging groups.
The OPEX tab

Operation and maintenance

FieldDefaultRangeWhat it does
Solar O&M3.0 Lac/MW/yrโ‰ฅ 0 Lac/MW/yrSolar annual O&M cost per MW
Wind O&M5.0 Lac/MW/yrโ‰ฅ 0 Lac/MW/yrWind annual O&M cost per MW
BESS O&M (fixed)5.0 Lac/yrโ‰ฅ 0 Lac/yrFixed annual BESS O&M cost
OPEX Escalation2.0%/yr0โ€“20%/yrAnnual escalation applied to all O&M

Revenue, export and penalty

FieldDefaultRangeWhat it does
PPA Tariff5.0 Rs/kWhโ‰ฅ 0.1 Rs/kWhContracted tariff for delivered energy
Penalty Multiplier1.5ร— tariff0.0โ€“3.0ร— tariffPenalty rate applied to DFR shortfall, as a multiple of the PPA tariff
Apply Annual CUF Cap (checkbox)offโ€”Enables an annual offtake ceiling; energy above it is paid at the Export Price instead of the PPA tariff
% (of CC ร— 8760) (with the CUF-cap checkbox)28.0%0.0โ€“100.0%The CUF ceiling itself, disabled unless the checkbox is ticked

Export price (3rd party)

FieldDefaultRangeWhat it does
Export Price mode (Fixed Price / CSV (15-min pricing))Fixed PriceFixed Price, CSV (15-min pricing)Chooses whether the 3rd-party export price is one fixed number or a 15-minute pricing series
Value (Fixed Price)0.0 Rs/kWhโ‰ฅ 0.0 Rs/kWhFlat 3rd-party export price
๐Ÿ“‚ Browse CSVโ€ฆ (CSV pricing)status No file loaded; unit combobox defaults Rs/MWh35,040 or 8,760 rows (hourly auto-interpolated), price column auto-detected (mcp/price/clearing/tariff/rate/rs, else the last numeric column)15-minute export-pricing time series (for example an exchange clearing price), converted to Rs/kWh internally when the unit is Rs/MWh

Grid charging

FieldDefaultRangeWhat it does
Grid Charging Price0.0 Rs/kWhโ‰ฅ 0.0 Rs/kWhPrice paid for grid energy used to charge the battery โ€” always, on a Standalone project; as a backup only, on a generation-backed one
Grid charging backup when generation is short (checkbox)off; disabled and forced off for Standalone BESSโ€”Lets a generation-backed plant top up from the grid on low-irradiance or low-wind days
Max Grid Charge Limit100%0.0โ€“100.0%Caps how much of the battery's usable capacity the grid may supply per charge cycle โ€” 100% is unrestricted

Optimisation target

FieldDefaultRangeWhat it does
Project Target IRR15.0%no explicit bound; falls back to 15% if the entry can't be parsedTarget project IRR the โš™ Optimise search โ€” and its "Hits Target IRR" scenario โ€” aims for

Where to go next

On this page